15th October: we were given the
tasks and I was given the role of Director. I had to oversee everyone’s
progress. I talked with Lauren about locations for filming the scenes and we
agreed on three locations that were the knavesmire woods, in town outside of a
nightclub and a road called the Horseshoe. I chose the song for our project
before the task began when we were first told about it and now I had to design
the storyboard for the video.
Everyone worked efficient in my personal opinion and hopefully; we will
work well as a group.
16th October: I continued work
on the storyboard while collaborating with Amy who was drawing the storyboard
in detail. I believe that Isaac worked on the risk assessment but I can’t
remember that much. Lauren assigned everyone his or her roles with me
officially being the director, herself as producer, Amy as a leading actor with
me and Isaac and everyone shipped in for the other roles. I am going to start
working on designing the costumes.
22nd October: Unfortunately I
was ill today so I don’t know what happened
23rd October: I was filled in of
what I missed yesterday. Interestingly, a new member joined our group yesterday
called Sam who I knew from when I did A-levels. I know he works hard and has a
good personality (And likes games like me) so he should fit in well with the
group. I continued to collaborate with Amy on the storyboard while the others
finished their tasks.
5th November: Unfortunately due
to an error by me by forgetting the equipment and costumes for the medieval
scene, We couldn’t film anything so we have had to slightly change the filming
schedule to make up for this.
6th October: We met up today at
the start of college, got all equipment and we made our way to our first
filming location, ‘The Horseshoe” and starting filming the first third of our
music video. We got most scenes so this shouldn’t be a problem although I
believe that we forgot one or two shots. We need to return back to college for
Catering needs and due to the fact the camera was running of battery. We
continued filming other things after that before retuning the equipment.
12th October: I really felt
brave today, after all, why would I walk to college in medieval Armour? We were
filming the medieval scene today so I brought in the necessary props including
an axe, sword, shield and such. After getting Amy into costume, we proceeded to
make our way to the Knavesmire to film. We got a few outtakes that were quite
funny and overall, everyone enjoyed themselves. After this, we got lunch and
proceeded to film the shots back at the horseshoe that we missed. I spent the
whole day in armour, walking around college and such, some people’s expressions
were funny.
19th October: We started editing
today. There were quite a few arguments due to the fact that our tutor lost our
footage by placing them in another group’s folder was annoying but every group
has their problems at times.
20th October: Everything went
well today. For extra shots, we went filming at the horseshoe again and then continued
with editing. Nothing much else happened today.
26th October: Finished everything
today including all documents, Music video and such. Everything went well today
and the project was a good project to work on.